EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sportsman
-
Listing for Category : Final (X)
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (661)
Rudder (III)
- (1)
Horiz S (IV)
- (11)
Elevator (V)
- (32)
Wing LH (VI)
- (107)
Wing RH (VI)
- (82)
Aileron(VII)
- (38)
Flaps (VII)
- (32)
Fuselage (VIII)
- (67)
Systems (IX)
- (113)
Avionics
- (13)
Engine
- (1)
Inspection
- (2)
Interior Finish
Lighting
- (1)
Paint / Decals
- (5)
Propeller
- (1)
Kit INVTRY
- (5)
Research
- (6)
Tools
- (1)
Workshop
- (13)
Wings
Final (X)
- (126)
FWF (X)
- (2)
Phase 1
- (2)
Builder Name:
Kyle Stone
-
Project:
Glasair - Sportsman 2+2
-
VIEW REPORTS
Total Hours:
1859.9
Start/Last Date:
Jul 03, 2019 - Jun 30, 2022
Engine:
Lycoming IO-390-EXP
Panel:
Garmin G3X w/ GNX375 IFR nav, GNC 255 NAV/COM
Friendly URL:
https://eaabuilderslog.org?s=Sportsman
Home or Last Project Picture
Aug 08, 2021
Step #17 - Fit floorboards
- (3 hours)
Category: Final (X)
Fit floorboards, drilled holes, installed screws (need to get 5/8" screws, not 1/2"). Used birch 1/4" plywood as per instructions. I'll seal with poly and paint w/ epoxy paint at a later date. Pleased with the install and the ole skill saw worked great!
28BD2A09-728F-4628-A700-23E850BF8547_1_105_c.jpeg
6258E9A8-0BC7-4681-816E-959E9AB7EC98_1_105_c.jpeg
91C059CE-354D-436D-8D76-13651D452438_1_105_c.jpeg
D22E70AD-9DC0-41F5-B52D-50AC55D17840_1_105_c.jpeg
F0E5B718-76DC-4F2C-82B9-254609DF0EC5_1_105_c.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.